Chapter 7 Commissioning
7.1 Commissioning guidelines 7-1
7.2 Initial commissioning 7-2
7.2.1 Align transmitter and receiver 7-2
7.2.1.1 Prepare for alignment 7-2
7.2.1.2 Adjustment templates 7-3
7.2.1.3 Adjustment directions of transmitter and
receiver
7-4
7.2.1.4 Align transmitter 7-6
7.2.1.5 Tool shapes 7-7
7.2.1.6 Align receiver 7-9
7.2.2 Adjustment template with bracket 7-13
7.3 Adjustment during tool change 7-15
7.3.1 Prepare for adjustment during tool change 7-15
7.3.2 Tool detection 7-15
7.3.3 Make adjustment during tool change 7-18
7.4 Enter overrun 7-21
7.5 Setting the parameters for bending angle
measurement
7-23
7.6 Check protective equipment 7-25
7.6.1 Function test of the safety device 7-25
7.6.1.1 Test during initial commissioning 7-26
7.6.1.2 Test after machine modification 7-26
7.6.1.3 Regular check 7-26
7.6.1.4 Prepare for function test 7-27
7.6.1.5 Function test using the test piece 7-28
7.6.2 Visual inspection 7-29
Chapter 8 Operation
8.1 Safety guidelines 8-1
8.2 Operating notes 8-2
8.2.1 Switch on PSENvip 8-2
8.2.2 Muting lamp 8-2
8.2.3 Initial press stroke 8-3
8.2.4 Measure bending angle 8-3
8.2.5 Acknowledge protected field modes 8-5
8.2.6 Tool change 8-6
8.2.7 Error messages 8-6
8.2.8 Cleaning the front lenses 8-7
Chapter 9 Diagnostics and Troubleshooting
9.1 Troubleshooting 9-2
9.1.1 Minor errors 9-2
9.1.2 Major errors 9-2
9.1.3 Fatal errors 9-3