
Commissioning
OperatingManualPNOZmB0
1002660EN03
17
6 Commissioning
6.1 Wiring
ThewiringisdefinedinthecircuitdiagramintheConfigurator.Thereyoucanselectthein
putsthataretoperformasafetyfunctionandtheoutputsthataretoswitchthissafetyfunc
tion.
Note:
}
Informationgiveninthe"Technicaldetails"mustbefollowed.
}
OutputsO0toO3aresemiconductoroutputs
}
Usecopperwirethatcanwithstand75°C.
}
Sufficientfuseprotectionmustbeprovidedonalloutputcontactswithinductiveloads.
}
Thesafetysystemandinputcircuitsmustalwaysbesuppliedbyasinglepowersupply.
Thepowersupplymustmeettheregulationsforextralowvoltageswithprotectivesep
aration.
}
Testpulseoutputsmustexclusivelybeusedtotesttheinputs.Theymustnotbeused
todriveloads.
Donotroutethetestpulselinestogetherwithactuatorcableswithinanunprotected
multicorecable.
6.2 Commissioningthecontrolsystem
Procedure:
}
Wiretheinputsandoutputsonthebaseunitinaccordancewiththecircuitdiagram.
}
Connectthesupplyvoltage:
– Supplyvoltageforthecontrolsystem:
– TerminalA1:+24VDC
– TerminalA2:0V
– Supplyvoltageforthesemiconductoroutputs:
– 24Vterminal:+24VDC
– 0Vterminal:0V
Pleasenote:Thesupplyvoltageforthesemiconductoroutputsmustalwaysbepresent,
evenifyouarenotusingthesemiconductoroutputs.
Whenthevoltagesarefedseparatelyusingtwopowersupplies,thesupplyvoltageforthe
controlsystemandthesupplyvoltageforthesemiconductoroutputsaregalvanicallyisol
ated.
CAUTION!
Donotconnectordisconnectexpansionmodulesandterminatorsduring
operation.
Kommentare zu diesen Handbüchern